URL: http://www.lctpc.org/e9/e67348/index_eng.html

A TIME PROJECTION CHAMBER FOR A FUTURE LINEAR COLLIDER

LCTPC Collaboration Testbeam  · 

Testbeam

The Large Prototype is currently being operated at the DESY II test beam in the area T24/1.

The latest schedule of the LCTPC activities at this test beam are listed below:

DayFebMarAprMayJunJulDay
1    French Group
Micromegas
Japan
&
DESY
Japan
&
DESY
1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 testbeam
maintenance
11
12 12
13 13
14 14
15 15
16 Blocked for
use of T24
16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 DESY26
27 27
28 28
29 29
30  Japan
& DESY
30
31 31


© 2012 Deutsches Elektronen-Synchrotron DESY