URL: http://www.lctpc.org/e39/e40/index_eng.html
![]() |
The construction of the fieldcage of the Large TPC Protoype has been finished. Today, the fieldcage arrived at DESY. In the next weeks, it will be tested mechanically, electrically and on gas tightness.
Below a few pictures are shown of its arrival.
© 2012 Deutsches Elektronen-Synchrotron DESY